SUBSCRIBE VIA EMAIL TO GET NEW BATCH UPDATES

Enter your email address to get new batch updates:

Delivered by FeedBurner

Wednesday, November 27, 2013

Manual Testing on 28 Nov @ 8:00AM-9:30AM by Mr. Kumar at S.R Nagar, Hyderabad

Batch Date: Nov 28th @ 8:00AM - 9:30AM

Faculty: Mr. Kumar

Duration: 15 days

Location : S.R Nagar, Hyderabad.
Fee: 500 INR
Venue :
Canara bank building 2nd floor,
near S. R Nagar Ploce Station,
Hyderabad-500038.
Contact no: 80 96 96 96 96.


Syllabus:
INTRODUCTION TO SOFTWARE TESTING
  • Introduction to software Testing
  • Testing Principals
  • Objectives of Testing
  • Cost of fixing defects
  • Software Development Process
  • Project vs. Product
  • Error / Bug / Defect
  • Why Software has defects
  • Most common defects
  • Verification vs Validation
  • Difference between QA & QC
  • Role of a Tester
SOFTWARE DEVELOPMENT LIFE CYCLE {SDLC}
  SDLC Phases
SOFTWARE DEVELOPMENT LIFE CYCLE MODELS
  • Waterfall Model
  • Prototype Model
  • V Model
  • Spiral Model
  • Agile Model
  • How to Identify a suitable model for a project
SOFTWARE TESTING METHODOLOGIES
  • White Box Testing
  • Black Box Testing
  • Gray Box Testing
STATIC TESTING TECHNIQUES
  • Reviews
  • Types of Reviews
  • Inspections & Audits
  • Walkthroughs
WHITE BOX TESTING
  • Unit Testing
  • Mutation Testing
  • Integration Testing
  • Big-bang approach
  • Top-down approach
  • Bottom-up approach
  • Stubs & Drivers
DEFECT / BUG LIFE CYCLE & DEFECT MANAGEMENT
  • When New Issue is assigned to Development
  • If the Issue and Steps are clear to reproduce the issue
  • If the Issue and Steps are NOT clear
  • When Issue is fixed by Developer and ready for Alpha Release
  • When it’s Time for Alpha Release
  • In case of Existing Issue – Assigned To Development
  • If the Issue is Not a Bug
  • Build Format
  • Testers/Developers
  • Production
  • Difference between Severity/Priority
BLACK BOX TESTING
   System Testing
USER ACCEPTANCE TESTING (UAT)
  • Alpha Testing
  • Beta Testing
SOFTWARE TESTING TEST PLAN
   Test Plan & Test Strategy
  • Reference Documents
  • Code Freeze Date
  • Change Control
  • Release Criteria
  • Test Items
  • New Product Features to Be Tested
  • Features Excluded from testing
  • Roles and responsibilities
  • Test Matrix
  • Risks and contingencies
  • Test Schedule/Estimates
  • Hardware/Software
  • Test Deliverables
Test Scenarios
Designing
BLACK BOX TEST DESIGN TECHNIQUES
  • ECP
  • BVA
  • Error Guessing
  • Real Time Template for Test case Design
  • Guide Lines for writing Test Cases
  • Difference between strategy and methodology
REQUIREMENT TRACEABILITY MATRIX
   RTM
TEST EXECUTION & TYPES OF TESTING
  • Smoke Testing
  • Sanity Testing
  • Integration Testing
  • Ad-hoc Testing
  • Re-Testing
  • Regression Testing
  • Recovery Testing
  • Risk Based Testing
  • End-to-End Testing
  • Exploratory Testing
  • Monkey Testing
  • UI Testing
  • Usability Testing
  • Security Testing
  • Performance Testing
  • Load Testing
  • Stress Testing
  • Volume Testing
  • Compatibility Testing
  • Configuration Testing
  • Installation Testing
  • Globalization Testing
  • Localization Testing
  • Acceptance Testing
  • Concurrent Testing
  • Parallel Testing
CHECK LIST
  • Software_Testing_Checklist
  • Testing_Project_Setup_Checklist
  • Website_Testing_Checklist
ADDITIONAL ACTIVITIES
  • Testing Opportunities
  • Development Process
  • Testing Process
  • Code Freeze Date
  • Communication b/w developer and tester
  • Guidelines for Writing Text Messages
  • Build Release process
  • Test Case Thinking Process
  • Positive Test Cases
  • Negative Test Cases
  • Testing Certifications
  • Interview Questions 
See more info.............http://www.durgasoft.com/manual%20testing-kumar.asp

No comments:

Post a Comment

Blog Archive